Use this procedure to install Cisco NCS 1010, NCS 1014, and NCS 1004 hardware. It helps you complete power, fiber, and passive connections for the Optical Access System workflow.
Prepare the hardware so it is ready for initial configuration.
Use these hardware-installation tasks in sequence. Each linked procedure is kept as a separate task step in the child topics.
Before you begin
Verify that the rack, power, grounding, hardware placement, cabling, and passive-connection details meet the site design and Cisco installation requirements.
Procedure
All hardware is installed and ready for console access and initial configuration.