Handling of Flow Failures from Target in EPS to 5GS Handover
The following call flow depicts the handling of flow failure from target RAN in EPS to the 5GS handover.

|
Step |
Description |
|---|---|
|
1 |
The AMF updates the SM context in the SMF by sending POST request with the following information:
|
|
2 |
If the target RAN succeeded in establishing resources for the PDU sessions, the SMF sets the hoState attribute to PREPARED and returns a 200 OK response including the following information:
|